德炜(中国)有限公司
Tecway (China) Limited

Product Detail

OPTIMA Compact Actuators HO-series

产品详情



页面提取自-05 EN I Frese OPTIMA Compact Actuators HO-series DN15-DN300.jpg

Size range:             DN15 to DN300

Characteristics:       Motoric, modulating IP54 to EN60529 (IP65 as accessory)

Protection class:     0(2)-10 V & 0(4)-20 mA

Control signal:        3-point

Manual operation:   Manual handle

Cable:                     Not included








中國九龙长沙湾青山道538号
538号半岛大廈25楼9-10
Units 9 & 10, 25/F., Peninsula Tower,
538 Castle Peak Road,
FCheung Sha Wan, Kowloon, Hong Kong. China

电话/Tel: +852-2548 3118
传真/Fax:+852-2548 3318
邮箱/E-mail: info@tecwayintl.com
微信公众号
德炜(中国)有限公司
Tecway (China) Ltd.
上海德炜船舶设备有限公司
Shanghai Tecway Marine Equipment Co, Ltd.
中国上海市普陀区云岭西路356弄4号楼405室
Room 405 Building No.4 ,Lane 356 YunLing West Road,
.Pudong New District
Shanghai. China. 200333

电话/Tel: +86-21-6917 7750 / 6917 7751
传真/Fax:+86-21-6917 8636
邮箱/E-mail: info@tecwayintl.com
Login
Login
Login by:
leave a message
back to the top